Cost & Savings Progression Model
A scenario model that projects component costs and savings as hardware moves from analog to IP over time. One button recalculates four scenarios using the ramp assumptions for every component.
- Industry
- Telecom / Hardware
- Deliverable
- Cost Savings Model.xlsm
- Built with
- Excel VBA, Scenario modelling
Before
Each cost scenario had to be recalculated separately.
After
One button recalculates all four scenarios from the ramp assumptions for every component.